Savings with an Economizer
The following table shows the annual electrical cost of cooling a 10 ft. x 20 ft. x 9 ft. (3m x 6m x 2.7m)
shelter in nine cities in the US. Costs are shown for an air conditioner without an economizer (ComPac I
units), for an air conditioner with an economizer (ComPac II units) and the savings. The savings do not
include any demand charges. The savings are based on the electrical usage of a five ton air conditioner and
an electric rate of $.10 per kilowatt-hour, the approximate average commercial rate in the US.
Hours of Operation Atlanta, GA Boston, MA Chicago, IL Dallas, TX Denver, CO Houston, TX
Annual Compressor & Condenser Motor Run Time
without Economizer (Hrs.)
6,531 6,348 6,361 6,628 6,472 6,655
Annual Compressor & Condenser Motor Run Time
with Economizer (Hrs.)
3,841 2,153 2,424 3,798 750 4,970
Run Time Savings with the Economimizer (Hrs.) 2,690 4,195 3,937 2,830 5,722 1,685
Annual Costs Saving ($) of 9.0 EER unit with an Economizer (ComPac II)
Annual Operating Cost 9.0 EER Unit without
Economizer ($)
$4,100.00 $3,985.00 $4,792.00 $4,161.00 $3,657.00 $4,178.00
Annual Operating Cost 9.0 EER with Economizer $2,685.00 $1,784.00 $2,315.00 $2,671.00 $940.00 $3,291.00
Annual Savings using 9.0 EER Unit with
Economizer
$1,415.00 $2,201.00 $2,477.00 $1,490.00 $2,717.00 $887.00
Hours of Operation Los Angeles, CA Miami, FL Phoenix, AZ Pittsburgh, PA Seattle, WA St. Louis, MO
Annual Compressor & Condenser Motor Run
Time without Economizer (Hrs.)
6,467 6,779 6,765 6,386 6,465 6,472
Annual Compressor & Condenser Motor Run
Time with Economizer (Hrs.)
3,862 6,391 3,106 1,929 1,654 2,716
Run Time Savings with the Economimizer (Hrs.) 2,605 388 3,659 4,457 4,811 3,756
Annual Costs Saving ($) of 9.0 EER unit with an Economizer (ComPac II)
Annual Operating Cost 9.0 EER Unit without
Economizer ($)
$4,060.00 $4,255.00 $4,247.00 $4,009.00 $3,653.00 $4,063.00
Annual Operating Cost 9.0 EER with Economizer $2,686.00 $4,051.00 $2,315.00 $1,667.00 $1,368.00 $2,090.00
Annual Savings using 9.0 EER Unit with
Economizer
$1,374.00 $204.00 $1,932.00 $2,342.00 $2,285.00 $1,973.00
Shelter Metrics:
•10’x20’x9’building
•Internalheatgain(electronicsload):12,000watts.
•Buildingsurfacearea(excludingfloorarea):740ft²
•R-Valueofwallsandceiling:R-12
•Internalsheltertemperature(Thermostatsetpoint):75ºF
Air Conditioner Metrics:
•ComPacIIEconomizersetting:57ºF(wetbulb)
•A/Cunitcapacity:60,000BTUH(5tons)with1-stagecompres-
sor
•NominalEER(unitefficiency):9.0(modelsAVPA)
•Costofpower:$.10perKWH
Operation of the 2-Stage Compressor Air Conditioners with a
CommStat 4™ Lead/Lag Thermostat Controller
Marvair’s HVESA air conditioners have 2-stage compressors. These units can provide substantial energy
savings and better control of temperature and humidity by matching the cooling requirement with the
performance of the air conditioner. First stage is typically 65% of the total (2-stage) capacity of the air
conditioner. When operated from power supplied by a generator, starting the air conditioner in 1-stage means
lower start-up amps.
When two, 2-stage air conditioners are controlled by a CommStat 4 lead/lag controller in a redundant
application, one of the air conditioners is the lead unit and the second is the lag unit. On a call for cooling,
the lead unit starts operation in the 1-stage (low capacity). If the temperature in the building continues to
rise above the set point temperature, the 1-stage (low capacity) of the lag unit will be initiated. When the
temperature in the building drops to the set point, the air conditioners will turn off. On a subsequent call for
cooling the process will repeat.
If the set point temperature is not reached with 1-stage capacity operation of both air conditioners after
approximately six minutes (this time period is field adjustable), the lead air conditioner will commence
operation in 2-stage (full capacity). If the temperature in the building continues to rise past the setpoint, the
lag unit will switch to 2-stage cooling approximately six minutes (field adjustable) after it began operation. At
that time, both air conditioners are operating in maximum capacity.
When the temperature in the building is satisfied, both units will turn off.
If the units have economizers (ComPac II air conditioners), the enthalpy sensor determines whether to use
outside air or use mechanical cooling. When the economizer is used, the compressors do not operate.